Monday 29 June 2009
Wednesday 24 June 2009
Scaffolding coming down at Fitzwilliam College
View of the south end from the College grounds
Oversailing eaves next to the south tower
The reader tower with Douglas Fir soffits to the upper and lower eaves
The raised access floor in place
View from the second floor to the Lasdun dining hall
Oversailing eaves next to the south tower
The reader tower with Douglas Fir soffits to the upper and lower eaves
The raised access floor in place
View from the second floor to the Lasdun dining hall
Tuesday 23 June 2009
Further progress at Fitzwilliam College
View in front of second floor window looking along zinc lower roof, Douglas Fir soffit boards above (temporary downpipes!)
Raised access floor to second floor
Zig-zag ductwork along the zig-zag facade
Raised access floor to second floor
Zig-zag ductwork along the zig-zag facade